Colorado Blog

C-470 office/flex park hits ground running

An office/flex park on the C-470 corridor in Littleton recently landed an anchor tenant and is rolling out additional speculative buildings.

A leading provider of three-dimensional printing solutions, 3D Systems Inc.

An office/flex park on the C-470 corridor in Littleton recently landed an anchor tenant and is rolling out additional speculative buildings.

A leading provider of three-dimensional printing solutions, 3D Systems Inc. leased a 70,000-square-foot building at the new 3D Systems Technology Center at Mountain West.

The company provides 3-D printing design-to-manufacturing solutions, including 3-D printers, print materials and cloud-sourced on-demand custom parts.

Three-D Systems Technology Center at Mountain West is a 25-acre master-planned park on C-470 between West Bowles and Belleview avenues. A 33,500-sf spec building recently was completed in the park, and site work for a third building totaling 50,000 sf is underway.

The development eventually will contain 300,000 to 325,000 sf of Class A single-story buildings of various sizes and is the only project of its kind being developed in the west/southwest metro area.

Visible to 64,000 vehicles per day on C-470, the business center will consist of showroom and office/industrial buildings with overhead, grade-level service doors and/or dock-high doors, four-sided architecture and fiber-optic service options.

With flexible design and build-to-suit options, it can accommodate the needs of a wide variety of tenants.

The recently completed 33,500-sf flex building, located at 5365 S. Alkire St., is ready for tenant improvements. It features two grade-level overhead service doors, 14-foot ceiling clearance and glass on all four sides.

Allan Ojala, general partner for the business center, is being assisted in the development by a team that includes Fred Baker and Bob Smith of Ojala & Co., Peter Beugg and Tyler Reed of Jones Lang LaSalle, David Forman of DCF Architecture and DCB Construction Company Inc., the general contractor.

Beugg said Class A construction, C-470 visibility and access, and flexibility make 3D Systems Technology Center at Mountain West a desirable option for tenants in the west/southwest submarkets, where vacancies are at historic lows of 1.9 and 1.7 percent, respectively.

Contact Michael Rasser

Michael E. Rasser
This email address is being protected from spambots. You need JavaScript enabled to view it.

Cornerstone Equity, LLC
1440 Iola St #B
Aurora, Co. 80010
Phone 303-756-5626
Fax 303-691-5637